Mezzanine Office Building 505
Agency: Hill Air Force Base
Construction of 2100 SQ FT offices on mezzanine in Building 505 including demo, prep, structure, electrical, data/com, and all office finishes. This project included the following types of work: patch repair and paint damaged areas, concrete filled pipes to protect equipment, concrete equipment stands, provided evaporative coolers, ductwork and supply diffusers, wall mounted propeller fans, interlocked cooler operator, water supply and drain, stand along control and monitoring capabilities, new breakers in existing electrical panels.
Agency: Hill Air Force Base
Construction of 2100 SQ FT offices on mezzanine in Building 505 including demo, prep, structure, electrical, data/com, and all office finishes. This project included the following types of work: patch repair and paint damaged areas, concrete filled pipes to protect equipment, concrete equipment stands, provided evaporative coolers, ductwork and supply diffusers, wall mounted propeller fans, interlocked cooler operator, water supply and drain, stand along control and monitoring capabilities, new breakers in existing electrical panels.