Zion Water Main Replacement to EOC Vault
Agency: National Park Services
SMB provided the replacement of 3270 LF of existing water main from the South Entrance station vault to the EOC vault. Work included relocation of the South Entrance station Vault. The existing 1930 – 1960 era 6” cast iron pipe was abandoned and replaced with an 8” PVC C-900 pipeline. Installation of the new pipeline increased the reliability of the water supply and helped maintenance personnel direct water where it was most needed. The project also increased water flow for fire protection.
Agency: National Park Services
SMB provided the replacement of 3270 LF of existing water main from the South Entrance station vault to the EOC vault. Work included relocation of the South Entrance station Vault. The existing 1930 – 1960 era 6” cast iron pipe was abandoned and replaced with an 8” PVC C-900 pipeline. Installation of the new pipeline increased the reliability of the water supply and helped maintenance personnel direct water where it was most needed. The project also increased water flow for fire protection.